Construction of 220 KV transmission line from 220/33 KV Phosal –Subsation (Kullu) to LILO point of AD Hydro Transmission Line was taken up on war footing and was completed as the best quality standards.

Construction of 220 KV transmission line from 220/33 KV Phosal –Subsation (Kullu) to LILO point of AD Hydro Transmission Line was taken up on war footing and was completed as the best quality standards.